So I ordered the yarn for Thermal, figuring, hey, I'd be done with the second black sock by the time it arrived, right?
Yeah, that was because I was using my production speed for when I'm not being a total slacker and playing World of Warcraft or A Tale in the Desert or Emperor or SimCity instead of knitting. So I have one black sock done, and the other's about ten rows into the foot. Meanwhile I have the ribbing and two repeats of the Thermal body pattern done (and at 296 stitches per round, that's not a small accomplishment, lemme tell you) and haven't so much as looked at the peacock beret in almost a month.
And over the weekend I went and picked up floss and fabric for the Conan sampler, and got most of a line of text done (the "see them driven before you" line, to be precise).
I'm developing a stash, and that is something I swore I'd never do. I've got the green yarn for another pair of knee-high socks and some nice multicolor for a pair of regular socks. Granted, they have associated projects, but at the rate I'm going I'm not gonna get them done before it's too warm to wear knee-high alpaca stockings...